Technical Renovation of the Metallurgical Technology in Guangxi Longtoushan Gold Mine


1. Brief Introduction
The original designed scale of the mineral processing plant of Guangxi Longtoushan Gold Mine was 100 tons/day; and a gold extraction process of whole slurry cyanidation and zinc precipitation was employed. Since there were many problems in its flowsheet, the techno-economic indices was not so good, and the mine run a difficult business. Aimed at these problems, Changchun Gold Research Institute suggested a reasonable technical renovation plan. The major part includes: modifying the process from the original amalgamation + cyanidation to gravity seperation, using centrifugal concentrator as the equipment to realize continuous operation in hard rock gold mine. During the process of cyanidation, assistant agent was added that improved the leaching effecct, increased the leaching rate, and improved the leaching recovery. A crusher was added in the crushing system, which not only lowered the particle size of crushing but also increased the milling capacity to 200 tons/day from 100 tons/day. In process of precipitation, plate frame pressure filter was creatively used to purify the pregnant solution, which achieved better purification effect, enabled big treatment capacity, and is simple and convenient in equipment maintenance and operation, high in gold recovery and good quality of gold slime.

 

2.Main Techno-economical Indices and Benefits
By using this technique, the production scale of this mine was increased to 200 tons/ day, the actual mineral processing recovery was increased to 89.16% from previous 69.31% before the technical renovation, the operation cost lowered to 105.70 yuan/ton from 145.54 yuan/ ton, and the accumulative economic profit was 7,426,600 yuan.

 

Due to application of the centrifugal concentrator, the concentrate grade reached 1% when the yield of gravity separation was 0.15‰, and the recovery up to 45%, and in turn, free gold in the ore was effectively recovered.

 

3. Application Prospects
The successful application of centrifugal concentrator in Longtoushan Gold Mine shows that the coarse and mediam-sized gold greater than 0.04mm in the ore can be fully recovered. Through practice and renovation in Longtoushan Gold Mine, the working life of the contrifugal drum of this equipment is extended by several times, and the jointing of the inner structures and the flushing mode for sand discharging are all automatic. It has the features of reliable in running, convienient and safe in maintenance, and its operation cost is low as well with the unit cost per ton of ore being only 0.23 yuan. Therefore, it can be widely applied in China to replace amalgamation operation to completely eliminate mercury pollution from gold mines for greater environment benefits.

The important merit of oxydol-assisted leaching and conventional oxygen-rich leaching prevailing in China is that there is no need to purchase expensive oxygen making equipment (for present scale of Longtoushan, 200 tons/day, the cost of oxygen making equipment to be 400,000 yuan), and also the dosage of oxydol is less (200 g/ ton), the cost is low (0.31 yuan /ton), it is easy to be applied in domestic gold mines.